Assistant Engineer, Electrical (16692) |
Assistant Engineer, Planning (12692) |
Assistant Engineer, Traffic (11282) |
Assistant Engineer, Transportation (10272) |
Construction and Maintenance Technician 1 (10133) |
Construction and Maintenance Technician 2 (10131) |
Engineering Technician 1 (59954/10122) |
Principal Engineer, Electrical (15008/16694) |
Principal Engineer, Planning (12694) |
Principal Engineer, Traffic (11284) |
Principal Engineer, Transportation (10274) |
Principal Environmental Engineer (16304/16314) |
Principal Environmental Specialist (12524/15854) |
Project Engineer, Construction (10895) |
Project Engineer, Electrical (10256) |
Project Engineer, Maintenance (11684) |
Project Engineer, Planning (12695) |
Project Engineer, Traffic (12696) |
Senior Engineer, Electrical (16693) |
Senior Engineer, Planning (12693) |
Senior Engineer, Traffic (11283) |
Senior Engineer, Transportation (10273) |
Senior Environmental Engineer (16303/16313) |
Supervising Engineer, Construction and Maintenance (10900) |
Supervising Engineer, Electrical (11265) |
Supervising Environmental Engineer (16297/16305) |
Supervisor of Bridges and Structures, Highway (41946) |
Incumbents will be assigned to serve as residents based on the suitability of their title and experience to the size and complexity of the projects.
3. Residents are entitled to a special rate of pay. The rate shall represent 5% of the average daily rate for each day served. This payment shall be made twice yearly on or about the first and fourteenth supplemental pay periods of the calendar year. A personnel transaction will be submitted for each individual showing a lump sum equaling 5% of the employee’s average daily rate for the period, times the number of work days for the period.
4. Duration of payments will be as follows:
a. In the Division of Construction and Materials:
The functional rate will go into effect on the date that a Preconstruction Meeting for the project takes place, in accordance with Construction Operations Bulletin 66-3G. The rate will cease 30 days after a final corrective action inspection has taken place, in accordance with Construction Operation Bulletin 76-1A.
b. In Electrical Systems:
The functional rate will go into effect on the date that a Preconstruction Meeting for the project takes place, and cease when as-builts are completed.