NJCSC - Compensation Compendium
FY 2007
     
PDF Version PDF Version
 

E. RESIDENTS ON CONSTRUCTION PROJECTS
    DEPARTMENT OF TRANSPORTATION

  1. This Section is applicable to residents on Department of Transportation construction projects. A resident is defined as a Department of Transportation employee, serving in any of the titles listed in 2. below, who is in charge of all aspects of a construction project from start to finish, and is on call on a seven-day, 24-hour basis.

  2. Employees in the following titles may be assigned to serve as residents:

    Assistant Engineer, Electrical
    Assistant Engineer, Planning
    Assistant Engineer, Traffic
    Assistant Engineer, Transportation
    Construction and Maintenance Technician 1
    Construction and Maintenance Technician 2
    Engineering Technician 1
    Principal Engineer, Electrical
    Principal Engineer, Planning
    Principal Engineer, Traffic
    Principal Engineer, Transportation
    Principal Environmental Engineer
    Principal Environmental Specialist
    Project Engineer, Construction
    Project Engineer, Electrical
    Project Engineer, Maintenance
    Project Engineer, Planning
    Project Engineer, Traffic
    Senior Engineer, Electrical
    Senior Engineer, Planning
    Senior Engineer, Traffic
    Senior Engineer, Transportation
    Senior Environmental Engineer
    Supervising Engineer, Construction and Maintenance
    Supervising Engineer, Electrical
    Supervising Environmental Engineer
    Supervisor of Bridges and Structures

    Incumbents will be assigned to serve as residents based on the suitability of their title and experience to the size and complexity of the projects.

  3. Residents are entitled to a special rate of pay. The rate shall represent 5% of the average daily rate for each day served. This payment shall be made twice yearly on or about the first and fourteenth supplemental pay periods of the calendar year. A personnel transaction will be submitted for each individual showing a lump sum equaling 5% of the employee’s average daily rate for the period, times the number of work days for the period.

  4. Duration of payments will be as follows:

    1. In the Division of Construction and Materials:

      The functional rate will go into effect on the date that a Preconstruction Meeting for the project takes place, in accordance with Construction Operations Bulletin 66-3G. The rate will cease 30 days after a final corrective action inspection has taken place, in accordance with Construction Operation Bulletin 76-1A.

    2. In Electrical Systems:

      The functional rate will go into effect on the date that a Preconstruction Meeting for the project takes place, and cease when as-builts are completed.
     
Copyright © State of New Jersey
Civil Service Commission
Go to NJCSC